We ran a ton of cable through the scene shop and down the hall to our other theatre, which had power. The lighting design had to become minimal, as we rushed to pull some LED fixtures out of one theatre to the next (while not as bright, they use standard wall power).
We also had two concerts in three days before tech for this show began...
As time consuming as this was, I managed to get some live video capture effects up for the show. I used VDMX for the camera and effects, controlled and run through syphon and projection mapping laid out in QLab. Timecoded MIDI triggers meant my operator, who was new to this part of stagecraft, only had to work within one application and push "Go." The extra bit of flash helped us compensate for the lack of lighting.
We made it, despite the odds! Video is below, followed by some photos.
-brian
-brian



No comments:
Post a Comment